Employer: ISKI
Location: Istanbul
Date of contract: 21.04.2006
Estimated cost (Value in 2006): 8.145.187$
Rate of Completion: 38%
Short description of project: The project includes installation of Ø300mm – Ø600mm concreate pipes and Ø300mm – Ø600mm steel pipes and storm water and sewerage system network lines construction in the territorial area of Beylikduzu Municipality.
|