Construction of sewerage network and collectors in town called Cerkezkoy located in the north western part of Turkey.
In the construction;
- L = 62.087 m Ø 200 mm concrete pipe,
- L = 8.594 m Ø 300 mm concrete pipe,
- L = 4.590 m Ø 400 mm concrete pipe,
- L = 2.780 m Ø 500 mm concrete pipe,
- L = 3.860 m Ø 600 mm concrete pipe,
- L = 284 m Ø 800 mm reinforced concrete pipe,
- L = 2.190 m Ø 1200 mm reinforced concrete pipe,
- L = 5.900 m Ø 1400 mm reinforced concrete pipe has been laid.
During this construction 410.000 m³ of earth was excavated. During the excavation 205.000 m² of sheet pile was used.
The facility became operational in 2004 with a cost of 16.492.219 $.
|