Sapanca (Sakarya) Sewage Network Construction

Construction of sewerage network in order to carry the waste water to the treatment plant in town called Sapanca located in the northern part of Turkey.

In the construction;

  • L = 2.280 m Ø 200 mm concrete pipe,
  • L = 2.460 m Ø 300 mm concrete pipe,
  • L = 860 m Ø 400 mm concrete pipe,
  • L = 460 m Ø 500 mm concrete pipe,
  • L = 1.560 m Ø 600 mm concrete pipe,
  • L = 800 m Ø 800 mm reinforced concrete pipe,
  • L = 1.110 m Ø 1000 mm reinforced concrete pipe,
  • L = 6.640 m Ø 500 mm asbestos cement pipe,
  • L = 830 m Ø 400 mm asbestos cement pipe has been laid.
  • On the other hand two elevation facilities and a reservoir with a capacity of 50 m³ was built.

The facility became operational in 1998 with a cost of 11.571.617$.